RePallet Co.Denver · Circular by design
Get a quote

Service · Custom build

Crates and skids built to the thing, not to a catalogue

If it is heavy, awkward, expensive or all three, a standard pallet is the wrong answer. Send us a drawing — or a photograph and a tape measure.

Request pricing

Everything marked with a star is required. The rest helps us quote faster.

Reply in 1 business day
A working address — every quote is answered by email.
US or Canadian number, in the format (303) 421-7788.
Two-letter code such as CO, or the full name.
US ZIP (80238 or 80238-1234) or Canadian postal code (T2P 1J9).
Whole numbers only.
No phone tag — we are an email-first yard. Fields marked * are required. See our privacy policy.

RePallet Co. designs and builds custom wooden crates, skids, bases and shipping boxes at its Denver yard, in any footprint, from reclaimed or new timber. Export crating is built to ISPM 15 and stamped accordingly.

Prototypes are typically ready in three to five working days and production runs in one to three weeks depending on size. We build from a drawing, a 3D file, a sketch, or a visit to look at the machine.

What we build

01

Heavy-duty skids

Three- and four-runner bases for machinery from 1,000 lb to 18,000 lb. Notched for forks and strapping, with load spreaders where the point loads demand it.

02

Closed crates

Fully sheathed plywood or solid-board crates with internal bracing, foam or block-and-brace packing, and lift-off or screw-down lids.

03

Open frame crates

Where the contents need to breathe or be inspected. Lighter, cheaper and often sufficient for domestic freight.

04

Slip sheets and bases

Low-profile bases for automated handling, and custom-sized load bases for products that do not fit a standard footprint.

05

Display and retail bases

Half and quarter footprints, sanded tops, branded stencilling for retail end caps.

06

Repeat production runs

Once a design is proven we hold the jig, so the tenth order is identical to the first and arrives faster.

Design and engineering input

Most crating failures are not material failures. They are design failures: a lifting point in the wrong place, a base that flexes across a fork spread, a lid that cannot be removed in the receiving bay. We will happily build exactly what you draw, but we will tell you first if we think it will fail.

  • Point-load analysis against fork spread and floor loading
  • Centre-of-gravity marking and lifting-point specification
  • Block-and-brace layout for shock-sensitive contents
  • Stacking and racking capability where storage is planned
  • Moisture and shrinkage allowance for long sea transits
  • Tare weight optimisation where freight is charged by weight
Bring the awkward job. Our favourite work is the item that does not fit anything: a 14-foot mast, a granite slab, a vacuum chamber that must not be inverted. Standard crating is easy; the interesting problems are why the shop exists.

Reclaimed or new timber

A surprising amount of custom crating can be built from reclaimed stock, and where it can be, it is cheaper and carries a far lower footprint. Where it cannot — because the load demands graded structural timber or the customer requires new material — we say so and price it as new.

ApplicationRecommended materialWhy
Domestic skids under 4,000 lbReclaimed hardwoodAmple strength; roughly 30% cheaper
Machinery over 8,000 lbNew graded structuralPredictable grain and known load rating
Sea freight, 6+ weeksNew, kiln-dried, heat-treatedMoisture control and ISPM 15 compliance
Retail display basesReclaimed, sandedAppearance is a feature, not a defect
Repeat production runsMixed, jig-builtConsistency matters more than origin
Anything food-adjacentNew, heat-treatedNo history to worry about

For export work, see heat treating & ISPM 15 — the stamp has to be on the wood, not on the paperwork.

How a crate is engineered

Most crating failures are design failures rather than material failures. These are the calculations and decisions behind any build we quote, in the order they get made.

  1. 1

    Weight and centre of gravity

    Measured rather than calculated where we can — two slings and a crane scale. Drawings are frequently 50 to 100 mm out on CoG height.

  2. 2

    Bearing points

    Where the load actually contacts the base. Four feet at 5" square carrying 16,000 lb is 200 psi, and that crushes a deck rather than bending it.

  3. 3

    Load spreaders

    Steel plate or hardwood blocking transferring point loads directly into the runners.

  4. 4

    Fork spread and pockets

    Sized for the largest truck that will handle it, not the smallest.

  5. 5

    Sling and crane points

    Marked, protected with steel angle, and positioned for the actual lift plan.

  6. 6

    Bracing

    Block-and-brace, foam, or suspension depending on shock sensitivity.

  7. 7

    Moisture strategy

    Kiln-dried timber, desiccant sized to void volume, VCI wrap, filtered breather vents.

  8. 8

    Compliance

    Heat treatment after construction, marked on two opposite faces.

Sealed crates trap the moisture already inside them. Filtered breather vents plus desiccant sized to the enclosed air volume beat a hermetic box on almost every ocean transit.

Materials, and when reclaimed will not do

Material selection by application. We use reclaimed stock wherever it is genuinely appropriate and new graded timber where it is not.
ApplicationMaterialReason
Domestic skids under 4,000 lbReclaimed hardwoodAmple strength; roughly 30% cheaper
Machinery over 8,000 lbNew graded structuralDocumented load rating and predictable grain
Sea freight, 6+ weeksNew kiln-dried, heat treatedMoisture control and ISPM 15 compliance
Shock-sensitive instrumentsNew, with engineered bracingPerformance has to be repeatable
Retail display basesReclaimed, sandedAppearance is a feature
Repeat production runsMixed, jig-builtConsistency matters more than origin
Anything food-adjacentNew, heat treatedNo history to worry about
Crates for regulated productsNew onlyDocumented provenance required

Plywood versus solid board

Plywood, OSB and particleboard fall entirely outside ISPM 15, which occasionally makes engineered board the simplest compliance route for an export job. It is also more dimensionally stable and better at resisting racking forces, at the cost of weight and price. For crates that will be opened and re-closed several times, plywood wins comfortably.

Prototyping, jigs and repeat orders

The first unit of any design is the expensive one. After that, the economics change sharply, which is why a prototype is almost always worth building even when the customer is in a hurry.

Typical unit cost curve for a mid-complexity export crate.
QuantityPer unitLead timeNotes
1 (prototype)$7203 – 5 working daysIncludes design time
2 – 9$5401 – 2 weeksDesign amortised
10 – 24$3952 weeksJig built; repeatable
25 – 99$3402 – 3 weeksBatch cutting
100+$2953 – 4 weeksScheduled production
Repeat order, jig held$2851 weekNo setup

We hold the jig for any design we have built more than twice, at no charge and indefinitely. It means the tenth order is identical to the first and arrives faster, and it means you are not re-buying a design you already paid for.

Test it before you ship it

For anything going on a long transit, build one and put a real load in it. Drive it round your yard on a forklift. Try to open it the way the receiving team will. We would far rather a design fails in Denver than in Rotterdam, and a prototype costs a fraction of a damaged machine.

Questions people actually ask

What is the minimum order for custom work?
One. We build single crates regularly, usually for machinery moves and trade-show shipments. Unit prices fall sharply from about ten units once the jig exists.
How fast can you build a prototype?
Three to five working days for most designs, faster if it is a variation on something we have built before. We would rather you test a prototype than discover a problem in Rotterdam.
Do you need a CAD drawing?
No. A dimensioned sketch, a photo with a tape measure in it, or a visit to your floor is enough. If you do have a CAD or STEP file, send it — it speeds things up.
Can you crate on site?
For large or delicate items, yes. We build the base and frame in the yard, transport it flat, and assemble around the item at your location.
Do you handle the export documentation?
We handle the ISPM 15 stamping and provide a treatment certificate. Customs documentation is your freight forwarder's job, and we will give them whatever they need from our side.
Can you work from a 3D model?
Yes — STEP, IGES or a native CAD file all work. A dimensioned sketch with weights and bearing points is equally useful, and a site visit is better than both for awkward items.
Do you do export documentation?
We handle the ISPM 15 stamping and issue a treatment certificate. Customs paperwork is your freight forwarder's job and we give them whatever they need from our side.
How heavy can you go?
We have built and shipped a 16,400 lb machining centre skid. Above about 20,000 lb the constraint stops being the crate and starts being your lifting and transport plan, and that conversation should happen first.
Can you crate on site?
For large or delicate items, yes. We build the base and frame in the yard, transport it flat and assemble around the item at your location.
Do you supply spare treated timber with export crates?
On request, and we recommend it. A crate repaired at destination with untreated wood loses ISPM 15 compliance for the whole unit, and the liability sits with the shipper.

Let's keep your pallets in the loop

Whether you have 40 broken cores behind the dock or need 4,000 Grade A pallets a month, the conversation starts the same way.