What the crating shop learned shipping a 16,400 lb CNC machine

Request pricing

Everything marked with a star is required. The rest helps us quote faster.

Reply in 1 business day
A working address — every quote is answered by email.
US or Canadian number, in the format (303) 421-7788.
Two-letter code such as CO, or the full name.
US ZIP (80238 or 80238-1234) or Canadian postal code (T2P 1J9).
Whole numbers only.
No phone tag — we are an email-first yard. Fields marked * are required. See our privacy policy.

Most crating is routine. Every so often something arrives that teaches you things, and this one taught us four.

A Front Range machine builder sold a vertical machining centre to a buyer in the Netherlands. Sixteen thousand four hundred pounds, an awkward centre of gravity well above the base, a cast-iron column that must not be shock-loaded, and six weeks of ocean transit ahead of it.

Lesson one: the feet are not the load

The machine sits on four levelling feet, each about 5" square. That is 82 square inches carrying 16,400 lb — roughly 200 psi concentrated at four points. Put that directly onto a skid deck and the deck boards will crush, not bend, and the machine will be sitting 15 mm lower on one corner by the time it reaches the port.

The answer was load spreaders: 3/4" steel plates under each foot, bearing onto hardwood blocking that transferred the load directly down onto the runners rather than across the deck boards. The deck, in the end, carried almost nothing structural. It was there to keep swarf off the floor of the container.

Lesson two: the lifting points decide the design

We started by designing a skid and then thinking about how it would be lifted. That is backwards. Once you know it will be lifted by a 30-tonne forklift at origin, a crane with slings at the port, and a smaller forklift at destination, the runner spacing and the fork pocket positions are determined for you.

  • Six runners rather than four, to give two viable fork spreads rather than one.
  • Fork pockets sized for 8" forks with 2" clearance, not the 4" forks the customer's own truck used.
  • Marked sling points with steel angle protection at each of the four crane contact positions.
  • Centre of gravity marked on all four faces at the actual measured height, not the calculated one.
  • “This way up” and maximum stack marks in three languages.
We measured the centre of gravity rather than calculating it. Two slings and a crane scale, twenty minutes, and it came out 90 mm higher than the drawing suggested. That 90 mm would have mattered on a crane lift in a swell.

Lesson three: six weeks at sea is a moisture problem

A sealed container crossing the Atlantic goes through a full temperature cycle every day. Warm humid air condenses on cold steel at night — container rain — and a cast-iron machine surface will corrode visibly within three weeks of that.

  1. Kiln-dried timber only. Wood at 18% moisture in a sealed container is a humidifier. We built with stock under 12%.
  2. Desiccant sized to the void volume, not to the crate footprint. The published rate is per cubic metre of enclosed air.
  3. VCI barrier wrap on the machined surfaces, sealed rather than draped.
  4. Breather vents with filters rather than a fully sealed crate. Sealed crates trap the moisture already inside them.

Lesson four: compliance is a build-order problem

ISPM 15 treatment happens after construction, so that the fasteners, the blocking and the runners are all inside the treated envelope. We knew that. What we had not fully internalised is that any repair after treatment with untreated wood invalidates the mark for the whole unit.

So we sent treated spare blocking with the shipment, labelled, with a note for the receiving team. If a runner had been damaged in transit and repaired in Rotterdam with a random board, the crate would have arrived compliant and left the dock non-compliant — and the liability for that sits with the shipper.

What it cost

Build breakdown. Reclaimed lumber was not used anywhere structural on this job.
ElementCost
New graded structural timber$1,340
Steel load spreaders and sling protection$410
Fasteners, adhesive, banding$185
VCI wrap, desiccant, vents$290
Labour, 34 hours$1,070
Heat treatment and IPPC marking$220
Centre-of-gravity measurement and marking$140
Total$3,655

Against a machine worth several hundred thousand dollars and a six-week transit that cannot be repeated cheaply, that is not a crating cost. It is an insurance premium with a timber frame.

It arrived square

Photographs from the buyer showed the crate opened, the machine level, no corrosion on the ways, and the desiccant still active. The four levelling feet were exactly where they started, which was the whole point.

#crating#export#engineering

Wes Arbogast

Custom Build & Crating

Runs the crating shop at the back of the yard. Has crated a CNC machining centre, a vintage Airstream axle and one taxidermied elk.