RePallet Co.Denver · Circular by design
Get a quote

Yard notes

How we grade: a walk down the sort line

Request pricing

Everything marked with a star is required. The rest helps us quote faster.

Reply in 1 business day
A working address — every quote is answered by email.
US or Canadian number, in the format (303) 421-7788.
Two-letter code such as CO, or the full name.
US ZIP (80238 or 80238-1234) or Canadian postal code (T2P 1J9).
Whole numbers only.
No phone tag — we are an email-first yard. Fields marked * are required. See our privacy policy.

Visitors always want to see the grinder. The grinder is the least interesting machine we own. The interesting thing is a person with a hook standing at the end of a conveyor.

Everything about a pallet yard's economics is decided in about four seconds per unit at the sort line. Route a repairable pallet to the grinder and you have destroyed nine dollars. Route a cracked stringer to the repair line and you have wasted four dollars of labour and produced a pallet somebody might rack.

The line, in order

  1. 1

    Gate and scale

    Trailer weighed, load photographed, batch reference opened. Everything downstream ties to that number.

  2. 2

    Unload and stage

    Stacks broken down onto the infeed. Pooled pallets pulled here, not later.

  3. 3

    Thaw or dry, if required

    November to March, and after any wet load. Grading wet wood is grading blind.

  4. 4

    Sort line

    The four-second decision. One grader, one hook, four outfeed lanes.

  5. 5

    Route

    Reuse, repair, remanufacture, dismantle. Four physical destinations.

  6. 6

    Verify

    A second grader spot-checks 3% of the reuse lane. This is how we know our accuracy.

The four-second decision

It is four questions, asked in a fixed order because the order minimises the number that need asking.

  1. Is it sound? Look down both stringers. A crack anywhere structural ends the inspection — it goes to dismantle. About 12% exit here.
  2. Is it clean? Mould, chemical staining, oil, char. Rejection, isolated, not into any stream. About 1%.
  3. Is it complete? Missing boards and shiners. Missing board goes to repair; shiners alone stay in the reuse lane with a quick shear.
  4. Is it original? Companion stringers and plugs. Present means Grade B; absent with ≤2 replaced boards means Grade A.

Most pallets are answered by questions one and four. The whole thing is a decision tree that fits in somebody's hands.

How we know it is working

Sort accuracy, measured by second-grader spot checks on 3% of the reuse lane.
MeasureTargetLast quarter
Grade A units correctly graded≥ 98%98.7%
Grade B units correctly graded≥ 96%97.1%
Repairable units wrongly sent to dismantle≤ 2%1.4%
Unsound units wrongly sent to reuse0%0.02% (3 units)
Customer grade disputes per 1,000 units≤ 0.50.31

The row that matters is the fourth. Three unsound units reaching the reuse lane in a quarter is three too many, and each one is investigated — which pallet, which grader, what time of shift. Two of the three last quarter were in the last forty minutes of a Friday.

Which is a scheduling finding, not a people finding. Grading accuracy degrades measurably after about five and a half hours on the line. We rotate graders now, and the Friday-afternoon pattern has gone.

Why we do not automate it

We have looked at vision systems twice. They are genuinely good at the things that are easy — missing boards, gross geometry, obvious damage. They are poor at the things that decide value: distinguishing a check from a crack, recognising a companion stringer under weathering, and smelling mould before seeing it.

A system that gets 92% of decisions right at four times the speed sounds attractive until you price the 8%. On our volume, an 8% error rate against a 1.3% human one is roughly $280,000 a year of misrouted value. When a vision system beats a trained grader on the hard cases we will buy one, and I expect that to happen. It has not yet.

The job

Grading is the best-paid non-management role in this yard, ahead of drivers and well ahead of the repair line. That is not generosity. It is the only role where a person's individual accuracy moves a six-figure number, and paying for it is the cheapest capital investment we have ever made.

#grading#process#standards

Marisol Quintanar

Yard Operations Manager

Runs the sort line and the intake gate. Has personally graded somewhere north of a million pallets and can call a Grade B from twenty feet.

Let's keep your pallets in the loop

Whether you have 40 broken cores behind the dock or need 4,000 Grade A pallets a month, the conversation starts the same way.