Buying & selling
The hidden cost of Grade A on a warehouse floor
Request pricing
Everything marked with a star is required. The rest helps us quote faster.
Somebody, once, specified Grade A. Nobody has revisited it since, and the purchase order has been copied forward for years.
This is one of the most common avoidable costs in pallet procurement, and it is almost always a documentation artefact rather than a decision. The original specification was made for a reason that may no longer apply — or may never have applied.
What you are actually paying for
Grade A is not stronger than Grade B in any meaningful sense. A Grade A pallet with two replaced deck boards is not stronger than one with none. What Grade A buys you is consistency and appearance.
| Attribute | Grade A | Grade B | Matters when |
|---|---|---|---|
| Structural soundness | Yes | Yes | Always — both are sound |
| Original stringers | Yes | Not necessarily | Racking, conveyors |
| Thickness consistency | High | Variable | Automation, wrapping machines |
| Appearance | Clean | Weathered | Customer-facing delivery |
| Remaining working life | Longer | Shorter | Closed loops |
The three questions
Ask these whenever a purchase order specifies Grade A. If all three answers are no, the specification is probably costing you money.
- Does it go on a rack beam? If yes, Grade A, and this is not negotiable. An unsupported span is unforgiving and a companion stringer changes the load path.
- Does it touch automation? Conveyors, AS/RS, robotic palletisers and high-speed wrappers all care about dimensional consistency. Grade A.
- Does a customer or an auditor see it? If a pallet arrives in a retail back room, a showroom or a pharmaceutical goods-in, appearance is part of what you are shipping. Grade A.
No to all three — internal floor movement, one-way outbound shipping, yard storage, dunnage — and Grade B is the correct specification.
What it can be worth
Grade B is generally priced below Grade A, so moving the volume that does not need Grade A is where the saving comes from. The larger your annual volume, the more that matters. Actual pricing is by quote from partner suppliers and depends on grade, volume, distance and timing.
The opposite mistake
It exists and it is worse. Buying Grade B because it is cheaper and then racking it is not a procurement saving, it is a deferred incident. A responsible supplier will question an order for Grade B destined for racking.
If price pressure is real and racking is required, the answer is volume and planning, not grade. A larger planned order of Grade A is usually cheaper per unit than a small one needed tomorrow, and it is still Grade A.
How to actually change it
Pull the last twelve months of pallet purchases. For each destination — not each order, each destination inside your operation — answer the three questions. In a typical distribution operation, a large share of volume answers no to all three.
Then change the standing order. That is the whole project. It takes an afternoon and it does not require anyone's approval except the person who owns the purchase order.