Logistics
What your dock tells a supplier before the truck arrives
Request pricing
Everything marked with a star is required. The rest helps us quote faster.
A 53' trailer sent to a site it cannot turn in costs everybody money and wastes a slot somebody else wanted. Six awkward questions up front prevent that.
Collections rarely fail because of the pallets. They fail because of the approach, the equipment, the hours or the ground. All four are knowable in advance and almost none of them appear in a first enquiry. The more of this you include in your quote request, the better the partner supplier can plan.
The six questions
- Can a 53' trailer enter, turn and exit without reversing onto a public road? If not, a supplier can send a shorter trailer or a box truck. Either is fine; discovering it on arrival is not.
- Dock leveller, ramp, or ground level? Ground-level loading needs a flatbed or a truck-mounted forklift. A dry van at ground level is unusable.
- Do you have a forklift and an operator available, and for how long? “We have a forklift” and “we have a forklift driver at 10 AM on Thursday” are different answers.
- What are the real dock hours, including any closed lunch period and the unofficial cut-off before the shift ends?
- Is there a site induction, a PPE requirement or a gate pass, and how far in advance is it needed? Some sites need plenty of notice.
- What is the ground like? Gravel, an unsealed yard, a slope, or a compound that has not been ploughed since the storm.
What each one changes
| Constraint | Equipment | Effect on the collection |
|---|---|---|
| Full dock, forklift, 53' access | 53' dry van | Usually the best rate; largest load |
| Ground level, forklift on site | Flatbed | Slightly smaller load |
| Ground level, no forklift | Flatbed with truck-mounted forklift | Smaller load, higher cost |
| Tight yard, no turning circle | Box truck, multiple trips | Highest cost per unit |
| Soft or unsealed ground | Hard-standing staging | You may be asked to move the stack |
The things people forget to mention
- A locked gate with a code nobody at the dock knows.
- A shared yard where another tenant's trailers block the approach at specific times.
- Low clearance — a canopy, a bridge on the approach road, an overhead pipe rack.
- Weight limits on a private road or a bridge.
- An access agreement with a landlord that requires notice.
- Snow. A yard that has not been ploughed is not a yard a trailer can turn in.
What a good request looks like
A request that gives a supplier everything they need covers: footprint and a rough count, a rough idea of condition, the city, whether the dock is high with a leveller, when a forklift and operator are available, whether a 53' can turn in the yard and which side it enters, any induction requirements, and a photo.
That is quick to write and lets a partner supplier quote and schedule without a round of follow-up questions. The quote form asks for most of these details for exactly that reason.