What your dock tells a supplier before the truck arrives

Request pricing

Everything marked with a star is required. The rest helps us quote faster.

Free to request
A working address, so a partner supplier can send your quote.
US or Canadian number.
Two-letter code such as CO, or the full name.
US ZIP or Canadian postal code.
Whole numbers only.
No phone tag — requests go to partner suppliers in our network. Fields marked * are required. See our privacy policy.

A 53' trailer sent to a site it cannot turn in costs everybody money and wastes a slot somebody else wanted. Six awkward questions up front prevent that.

Collections rarely fail because of the pallets. They fail because of the approach, the equipment, the hours or the ground. All four are knowable in advance and almost none of them appear in a first enquiry. The more of this you include in your quote request, the better the partner supplier can plan.

The six questions

  1. Can a 53' trailer enter, turn and exit without reversing onto a public road? If not, a supplier can send a shorter trailer or a box truck. Either is fine; discovering it on arrival is not.
  2. Dock leveller, ramp, or ground level? Ground-level loading needs a flatbed or a truck-mounted forklift. A dry van at ground level is unusable.
  3. Do you have a forklift and an operator available, and for how long? “We have a forklift” and “we have a forklift driver at 10 AM on Thursday” are different answers.
  4. What are the real dock hours, including any closed lunch period and the unofficial cut-off before the shift ends?
  5. Is there a site induction, a PPE requirement or a gate pass, and how far in advance is it needed? Some sites need plenty of notice.
  6. What is the ground like? Gravel, an unsealed yard, a slope, or a compound that has not been ploughed since the storm.

What each one changes

How the answers typically change the equipment a supplier sends.
ConstraintEquipmentEffect on the collection
Full dock, forklift, 53' access53' dry vanUsually the best rate; largest load
Ground level, forklift on siteFlatbedSlightly smaller load
Ground level, no forkliftFlatbed with truck-mounted forkliftSmaller load, higher cost
Tight yard, no turning circleBox truck, multiple tripsHighest cost per unit
Soft or unsealed groundHard-standing stagingYou may be asked to move the stack

The things people forget to mention

  • A locked gate with a code nobody at the dock knows.
  • A shared yard where another tenant's trailers block the approach at specific times.
  • Low clearance — a canopy, a bridge on the approach road, an overhead pipe rack.
  • Weight limits on a private road or a bridge.
  • An access agreement with a landlord that requires notice.
  • Snow. A yard that has not been ploughed is not a yard a trailer can turn in.

What a good request looks like

A request that gives a supplier everything they need covers: footprint and a rough count, a rough idea of condition, the city, whether the dock is high with a leveller, when a forklift and operator are available, whether a 53' can turn in the yard and which side it enters, any induction requirements, and a photo.

That is quick to write and lets a partner supplier quote and schedule without a round of follow-up questions. The quote form asks for most of these details for exactly that reason.

#collections#access#operations

RePallet Co. Editorial

Editorial team

These guides are written by the team behind RePallet Co., a referral service that connects businesses across Denver and the Colorado Front Range with partner pallet suppliers in its network. We do not run a yard ourselves; we pass quote requests to partners who do, and we write up what buyers and sellers of pallets generally need to know.

Let's keep your pallets in the loop

Whether you have 40 broken cores behind the dock or need 4,000 Grade A pallets a month, the conversation starts the same way.